![]() ![]() Two hazardous waste containment buildings, with a total maximum capacity of 1,305 cubic yards.Four hazardous waste container storage areas, with a total maximum capacity of 817,250 gallons.Green America and Continental Cement are currently permitted to operate: Green America stores “characteristic” hazardous wastes, as well as various F-, K-, P-, and U- listed hazardous wastes. 18, 2029, and its Part II Permit expires Aug. Green America’s existing Hazardous Waste Part I Permit expires Nov. 18, 2019, and an EPA-issued Hazardous and Solid Waste Amendments Part II Permit, effective Aug. The Green America facility is currently operating under a department-issued Missouri Hazardous Waste Management Facility Part I Permit, effective Nov. ![]() The resulting wastes are stored in tanks until fed to the rotary kiln as liquid fuel. The liquid hazardous wastes are “blended” with other hazardous waste to achieve the desired fuel characteristics. Most of the hazardous waste comes from off-site via truck and railcar. Green America operates the hazardous waste fuel programs, which includes receiving, sampling, off-loading, storing and processing the liquid and solid hazardous wastes received at the facility. To supplement its fuel needs, Continental Cement also uses non-hazardous waste fuels, such as used oil, and a variety of liquid and solid hazardous waste-derived fuels. Continental Cement uses mainly pulverized coal to heat its kiln. Continental Cement operates a dry process cement kiln that produces clinker, the main ingredient in Portland cement. The facility name is Green America Recycling however, the regulated activities are performed by both Continental Cement Co. The Green America Recycling facility is located on about 3,500 acres in Hannibal. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |